Turf Installation (2014): Field turf installation: COMPLETED FALL 2014! Thank you to all the donors who helped make this a reality! Estimated cost of $700,000, which includes field and contruction of base underneath.
Stands, Press Box and Video Board (2015): Phase 2 construction is complete! This phase includes home stands with seating for 4,200, Visitors seating for 3,000, Band Seating for 300, Press Box, new stadium-wide sound system, and 35 x 20 ft video scoreboard, and concrete walkways. Estimated cost of $1.8 million.
Band Shell (2016) – In August of 2016, the first part of Phase 3 was completed as the Boardman Spartan Marching Band received their new home with a band shell. The band shell has seating for 300+ band members, includes interior lighting, and a shelter for the band from rainy conditions. The band shell was made possible through a generous donation from Bill and Karen Veri.
Track Replacement (2017) – During the Summer of 2017 the current track base was removed and replaced, and also resurfaced. This new track will allow Spartan Stadium to host future invitational and district/regional meets.
Locker Rooms, Concessions, and Restrooms and Refresh Dental Ticket Booth(2020) – Sports Complex Building #3 – includes boys/girls locker rooms with nearly 200 total lockers, public restrooms and concessions. Also, a ticket booth was constructed, sponsored by Refresh Dental which is attached to this new facility.
Still to Come…
- Remaining Items to be Completed
- Lower tier of the concessions plaza. The upper tier was completed in 2020.
- Ticket booths – 2 remaining ticket booths – one at the North home side entrance and one at the South Tennis Court entrance.
- Main entrance gates and donor wall
- Expansion of the Weight Room Facility (middle building) to add appx 2,000 sq feet of weight room space to the front of the building and also re-face the facility.
- Front entrance sidewalk with donor bricks
HOW YOU CAN DONATE?
Sponsor a Half-Sized Locker: Spartan Stadium Locker Campaign
Buy a Brick: Click Here to Buy Brick Online
See what we’ve accomplished to-date with the support of our community and Spartan Nation!
Building #3
Locker Room in Building #3 showing full-size lockers
Locker room showing half-size lockers
Help us reach our fundraising goal and finish Spartan Stadium! Thanks for your support!